References
former precast plant named Schwörer at Laußig near Leipzig
|
The production- and storage area - approx. 60.000 m² - have been completely cleared. Hydraulical mould tables and 6 hydraulic bridge girders- / beam moulds (l = approx. 60 m) have been dismantled. Right after the takeover of the precast factory Elster a reuse of the halls and the area was found. |
 |
|
click the picture... |
 |
former precast palnt named Schwörer at Laußig near Leipzig
On a production surface of approx. 10,000 m², partially two-storied,
3 large plants for the production of walls and ceilings as well as
for bar parts and special parts were disassembled in a professional manner.
A central mixing plant (output 200 m³/h) in the middle of the
production hall posed a big challenge.
In addition, gantry cranes on the in- and outside were dismantled.
|
 |
|
click the picture... |
 |
|
|
former precast plant named Schöner at Cadolzburg near Nürnberg
The production surfaces comprised approx. 5,500 m², which were equipped with production lines for bar parts, wall elements and special parts. Furthermore, a compact mixing plant with two cement silos was dismantled and loaded.
The cranes with a track gauge of 20 m remained on site.
|
 |
|
click the picture... |
 |
|
|
former precast plant named KDF at Kulmbach near Bayreuth
|
The production comprised mainly the manufacturing of element ceilings. A pallet rotation plant with drying chamber for 30 pallets and fully-automatic shelf access equipment of man. AVERMANN and an adjusting and cutting line, make PROGRESS, were dismantled. |
 |
|
click the picture... |
 |
|
|
former precast plant named Ellert at Bodenwöhr near Regensburg
|
The production comprised a concrete pipe plant with paving stone line. In addition, wall elements, beams and girders with tandem tilting tables and twin beam moulds were manufactured. |
 |
|
click the picture... |
 |
|
|
|